Life just seems sooooooo busy, all the time, I just had to make a little time in the workshop to progress with getting it in a working state so I can actually get to the machines and surfaces without having to manhandle a ton of stuff out of the way.
This is VERY small progress and can barely be classed as woodwork, but it did fulfil its brief of cleaning up the benchtop a bit, and only took about 30 mins, so I'm happy.
The longer term plan is French cleats all along the walls where the benching is and have all this stuff on movable sections that can be arranged as required, but I can't get to the bandsaw to cut the cleats, so this is just screwed to the wall for now. I'm relaxed about this one though because I have an emergency stop button at the exit that powers every socket off except those 4 near the chargers, so I can ensure safety of visitors/kids by having no power to the big dangerous machines, while being able to charge batteries at just those sockets.




This is VERY small progress and can barely be classed as woodwork, but it did fulfil its brief of cleaning up the benchtop a bit, and only took about 30 mins, so I'm happy.
The longer term plan is French cleats all along the walls where the benching is and have all this stuff on movable sections that can be arranged as required, but I can't get to the bandsaw to cut the cleats, so this is just screwed to the wall for now. I'm relaxed about this one though because I have an emergency stop button at the exit that powers every socket off except those 4 near the chargers, so I can ensure safety of visitors/kids by having no power to the big dangerous machines, while being able to charge batteries at just those sockets.



