• Hi all and welcome to TheWoodHaven2 brought into the 21st Century, kicking and screaming! We all have Alasdair to thank for the vast bulk of the heavy lifting to get us here, no more so than me because he's taken away a huge burden of responsibility from my shoulders and brought us to this new shiny home, with all your previous content (hopefully) still intact! Please peruse and feed back. There is still plenty to do, like changing the colour scheme, adding the banner graphic, tweaking the odd setting here and there so I have added a new thread in the 'Technical Issues, Bugs and Feature Requests' forum for you to add any issues you find, any missing settings or just anything you'd like to see added/removed from the feature set that Xenforo offers. We will get to everything over the coming weeks so please be patient, but add anything at all to the thread I mention above and we promise to get to them over the next few days/weeks/months. In the meantime, please enjoy!

Another gate

mailee

New Shoots
Joined
Jul 22, 2014
Messages
214
Reaction score
0
I got another fill in job yesterday for a gate. I must be getting good at these as this one only took me an afternoon to complete. :D

I shall be fitting it next week along with hanging two doors. :D
 
Alan looks good. Your speed and quality of work is impressive.

I would spend a week thinkng about it, 6 weeks planning and six months building :oops:

Cheers
Phil
 
Phil":32hzo0sd said:
Alan looks good. Your speed and quality of work is impressive.

I would spend a week thinkng about it, 6 weeks planning and six months building :oops:

Cheers
Phil


Which would be about 4 months quicker than me. :D
 
Phil":11gk57rv said:
Alan looks good. Your speed and quality of work is impressive.

I would spend a week thinkng about it, 6 weeks planning and six months building :oops:

Cheers
Phil
A man after my own heart! [emoji6]

Cheers
Mark
 
TrimTheKing":2zmby899 said:
Phil":2zmby899 said:
Alan looks good. Your speed and quality of work is impressive.

I would spend a week thinkng about it, 6 weeks planning and six months building :oops:

Cheers
Phil
A man after my own heart! [emoji6]

Cheers
Mark

Sounds all too familiar! :oops:
 
mailee I know this is an old post but you may still pick up this question:

I know your framed gate is relatively straightforward but how do you manage to make a framed gate like this in an afternoon????

I'm only guessing but time wise I'd probably take at least 1/2 hour marking out, 1/2 hour sanding and cleaning, 1/2 hour clamping together, 1/2 hour on mortices, 1/2 hour on tenons, 1 hour fitting the boards, 2 hours machining the timber for framing, 1/2 hour on the spindle for groove to fit boards in. 6 hours in total at least. And that's if everything went well. In reality I'd be lucky to make this in a day.

I just don't know how you do it :text-lol:
 
meccarroll":39ryh5v6 said:
mailee I know this is an old post but you may still pick up this question:

I know your framed gate is relatively straightforward but how do you manage to make a framed gate like this in an afternoon????

I'm only guessing but time wise I'd probably take at least 1/2 hour marking out, 1/2 hour sanding and cleaning, 1/2 hour clamping together, 1/2 hour on mortices, 1/2 hour on tenons, 1 hour fitting the boards, 2 hours machining the timber for framing, 1/2 hour on the spindle for groove to fit boards in. 6 hours in total at least. And that's if everything went well. In reality I'd be lucky to make this in a day.

I just don't know how you do it :text-lol:


when you do them every other day .. your times are way off !
I'd "raise" your 1/2 hrs to 10 mins ..
Machining? .. bought in at size .. it's just a gate !

I reckon this table took me a day tops (a one off) .. without drying times
DSC02000.jpg
 
Tusses":nn7xp8tt said:
meccarroll":nn7xp8tt said:
mailee I know this is an old post but you may still pick up this question:

I know your framed gate is relatively straightforward but how do you manage to make a framed gate like this in an afternoon????

I'm only guessing but time wise I'd probably take at least 1/2 hour marking out, 1/2 hour sanding and cleaning, 1/2 hour clamping together, 1/2 hour on mortices, 1/2 hour on tenons, 1 hour fitting the boards, 2 hours machining the timber for framing, 1/2 hour on the spindle for groove to fit boards in. 6 hours in total at least. And that's if everything went well. In reality I'd be lucky to make this in a day.

I just don't know how you do it :text-lol:


when you do them every other day .. your times are way off !
I'd "raise" your 1/2 hrs to 10 mins ..
Machining? .. bought in at size .. it's just a gate !

I reckon this table took me a day tops (a one off) .. without drying times
DSC02000.jpg

Yes I'd agree if you only do joinery occasionally (as I do) it does take longer to think about the processes and do them. My machines still only work at a certain feed rate though no matter how many I do so that can't be changed.

I have used pre machined timber in the past but found it to be very variable in quality of machining, one batch comes it straight the next just about every piece bowed and unusable (even when it's specified for doors). Now I get my own timber and do the machining myself, a lot slower but at least I can use the timber.

Not bad going on that table Tusses.

Mark
 
I agree, Mark, but I think that Tusses point was that it was only a gate and so buying in ready prepared timber is quicker since it doesn't matter if there are small variations in dimension.
 
RogerS":24uawk4w said:
I agree, Mark, but I think that Tusses point was that it was only a gate and so buying in ready prepared timber is quicker since it doesn't matter if there are small variations in dimension.


I totally agree that using pre machined timber would save me about 1 or 2 hours on making a similar gate.

The trouble I have is there are only two timber merchants that sell joinery grade timber locally. The merchant in my town have in the past sold me second grade timber mixed with joinery and it's been a pain to work with. The best merchant nearest to me is in the next town and when I've ordered pr-machined timber from them in the past it's come in bowed. I could not use bowed timber even for a gate so I select my own and do my own machining.

Maybe I should change my way of doing things.

Mark
 
meccarroll":4uw95q2f said:
.....
Maybe I should change my way of doing things.

Mark

I think it depends on what ones' making and ones own philosophy. If I was churning out the same thing day-in-day-out I think I would go the pre-machined route and design the end-product around what was available. Otherwise it would do my head in sending stuff through the thicknesser for ever and a day. Or hand-planing it if you're Woodbloke ;)

If you're making a one-off then there is much more satisfaction in getting it 'just right', proportions etc.
 
I deliberately didn't mention when I put the table photo ..

it was a 5 pack of softwood for the top and apron .. plastic wrapped from Wickes !
The legs are CLS.
Leg Mortices I did on the CNC - much like you would with a router jig.
Tenons and breadboard edge on the TS

Drawer boxes are ply, and the fronts are plunge cut from the board they fit into.

it was made after watching "Norm" make something similar .. :lol:

I used to make a similar design, but small kitchen table sizes and knock them out for £100 with a finish :o
could easily do a few a day with the finish drying overnight.

With a bigger space, I could probably be quicker.
 
RogerS":f1ylfmss said:
meccarroll":f1ylfmss said:
.....
Maybe I should change my way of doing things.

Mark

I think it depends on what ones' making and ones own philosophy. If I was churning out the same thing day-in-day-out I think I would go the pre-machined route and design the end-product around what was available. Otherwise it would do my head in sending stuff through the thicknesser for ever and a day. Or hand-planing it if you're Woodbloke ;)

If you're making a one-off then there is much more satisfaction in getting it 'just right', proportions etc.

I totally agree with the above Roger.