• Hi all and welcome to TheWoodHaven2 brought into the 21st Century, kicking and screaming! We all have Alasdair to thank for the vast bulk of the heavy lifting to get us here, no more so than me because he's taken away a huge burden of responsibility from my shoulders and brought us to this new shiny home, with all your previous content (hopefully) still intact! Please peruse and feed back. There is still plenty to do, like changing the colour scheme, adding the banner graphic, tweaking the odd setting here and there so I have added a new thread in the 'Technical Issues, Bugs and Feature Requests' forum for you to add any issues you find, any missing settings or just anything you'd like to see added/removed from the feature set that Xenforo offers. We will get to everything over the coming weeks so please be patient, but add anything at all to the thread I mention above and we promise to get to them over the next few days/weeks/months. In the meantime, please enjoy!

Jimmy Mack's 'Shop Build (photos & video)

Jim

Not an identical situation but my 22mm T&G chipboard flooring is sitting directly on polystyrene insulation over the concrete slab, so no option to fixe to that. It is glued so it floats as one large section. I think to be honest it is the weight of the machinery that holds it down rather than the skirting, which is only partial round the walls. No issues encountered at all so far.

Terry.
 
The distribution board and socket ring is in, I've tidied up some wiring. In hind sight I should of used conduit singles cable (as opposed to Twin & E), as it was a struggle in places, some conduit lube too might of been handy. My sparks wasn't keen for me to use conduit cable, not sure why. I've 3 phase runs to do onto rotary isolators....then my Sparks can check, hook me up and sign off....but first I've cleaned the floor so I can get the 22mm, T&G chip board started tomorrow.

Some pictures.

aa2746f4631e620b46b1d80913b8c441.jpg


d53058377a8ff9b9b3bd05137392ec7c.jpg
8f32c1dbcf3742989c3cd20f916177f5.jpg


Knocked up some window cills out of left over ply and some 2x1 tanalised. I'll stick 'em & caulk 'em when the varnish is dry.

e59853b39756a8c111543e5528ae3e38.jpg


I'm aware that I'm not really showing any detailed working...do do feel free to ask questions or point out potential goofs.

Cheers, Jim

Sent from my HTC 0P6B900 using Tapatalk
 
:text-coolphotos:

So cool, I thought I'd been on the Ringwood Old Thumper again!! :obscene-drinkingcheers:
 
I had the same trouble with Twin and E and wished I had used singles. Sorry I did not mention it earlier. Yours does look very neat and the UK boxes are far easier to wire than what we have here.
 
I presume this curved wall business comes from some sort of panoramic view processing from a modern camera but I would have thought that the processing algorithm would aim to detect floor/wall lines and make them straight.
Very very vague 40 year old memories from college days of "guzmann's algorithm" for this sort of thing?

Bob

Correction it was Mr Guzman. Heaven knows how my memory recalled that as i never had to code such an algorithm.
 
ScotlandtheDave":2gkm2ij5 said:
RogerS":2gkm2ij5 said:
I do hope that consumer unit is metal ;)

RogerS":2gkm2ij5 said:
I do hope that consumer unit is metal ;)

So Jimmys shop IS big enough to get an echo ;)
[emoji23] ...certainly glad it's not any bigger, my body is in pieces.

[emoji23] ...certainly glad it's not any bigger, my body is in pieces

Sent from my HTC 0P6B900 using Tapatalk
 
RogerS":3dbprk94 said:
I do hope that consumer unit is metal ;)
Went for a beefy metal Wylex so I've got somewhere to stick those naff holiday fridge magnets [emoji3] ...I splashed out on the consumer unit...always worth spending a bit more here, I feel

Good point on the panorama Bob.. (not so) SMaRt phones! I actually tried to get all the way round...but it gave up on me!

Sent from my HTC 0P6B900 using Tapatalk
 
Got the chip board floor down yesterday, was going great until I realised I'd fired over an access point, so had to go back a few steps. The adhesive it's very similar to PU but more gloopy, and foams to a more Brittle foam which crushes and snaps like polystyrene.

Some snaps...

Laser to set my parallel and square. There's a screw at the other end to sight off. Cheapo, but quite good Aldi digital measure to help with the perpendicular

1926332e95a63cda1bf3f63388380968.jpg


Chalk line so I can get the lights back on...

664e01d7e1cc506c44ebb76c22003eb9.jpg
b14583b3f27a8574c076137248dddf62.jpg


The all important...

7f8fe43ca0538132db3161358ae0f9ed.jpg


Wonder if kids still use these...use to love tinkering with mine when I was a nipper, combining parts to make a mega compass!
4985490993812619f890bcca883f8354.jpg


First run with access plug...
db7351e4059bd6553d883799b2541461.jpg


4ft level to make sure I'm not running out...

9b68e96c62b2fc96fba7c6856e7e48f9.jpg


Cooking on gas...that's a broom handle in the shot, just to make sure there's no debris getting trapped under the boards as I go.

8ab048333401cc690d9407e59f5ab48a.jpg


And across...
85fc145a5f7f96578473c7eda49eeea8.jpg


d6458aa2c7d0d5bc46075a9abc56e302.jpg

Liked to of got my joints a bit tighter, but I think once I've got a bucket of paint down and some gear in place, none will be the wiser [emoji6] A couple of chipped corners to fill with Body filler, then paint next week.

9dceecd3a45de32011e33fc67bcdabc0.jpg


Sent from my HTC 0P6B900 using Tapatalk
 
Jimmy Mack":2p4ztxej said:
......Liked to of got my joints a bit tighter........

Once you get into the middle of the floor there is nothing to brace against to lever them tight. It's a pain!
 
Mike G":2zhym3vw said:
Jimmy Mack":2zhym3vw said:
......Liked to of got my joints a bit tighter........

Once you get into the middle of the floor there is nothing to brace against to lever them tight. It's a pain!

Unless you use some of these ?

ae235


or you temporarily screw a batten onto the joists about 3" away from the last board and then tap folding wedges in to tighten up the floorboards/boards.
 
Jimmy:

I'd lost track of your build progress, and started looking again this morning. Your drywall work brought me flashbacks of my shop.:) The spotted wall look was exactly like mine, and your lift was even the same color. After that, I swore I would never do drywall again. :)
the_pox_3.jpg

(I bought my lift used, then sold it for the same price when done. I recommend this over renting because you aren't limited on time that way.)

I also applaud the below-floor dust collector piping. I only did a short run of that to get to the center of my shop, but it's been one of the best features I put in. I also have a 5 hp dust collector, and have had no issues with any clogging. I did accidentally suck up a rag one time, though, and I don't recall seeing it in the bin afterwards. I did manage to look in the main line of pipe though and it didn't get hung up there. :)

It looks great so far. I hope you have enough outlets for all your needs. I wish LED lighting had been available when I did mine, but my stuff is too new to retrofit so I'm living with it as is.

Kirk
 
RogerS":j49kb3fe said:
Mike G":j49kb3fe said:
Jimmy Mack":j49kb3fe said:
......Liked to of got my joints a bit tighter........

Once you get into the middle of the floor there is nothing to brace against to lever them tight. It's a pain!

Unless you use some of these ?

ae235


or you temporarily screw a batten onto the joists about 3" away from the last board and then tap folding wedges in to tighten up the floorboards/boards.

A set of those would of been very handy Roger...I think I could of put a bit more effort in perhaps with a batten and some folding wedges, as you say (Wedges, of which I have plenty, after cutting my rafters!)

Thanks,

Jim
 
kirkpoore1":1gh33rca said:
Jimmy:

I'd lost track of your build progress, and started looking again this morning. Your drywall work brought me flashbacks of my shop.:) The spotted wall look was exactly like mine, and your lift was even the same color. After that, I swore I would never do drywall again. :)
the_pox_3.jpg

(I bought my lift used, then sold it for the same price when done. I recommend this over renting because you aren't limited on time that way.)

I also applaud the below-floor dust collector piping. I only did a short run of that to get to the center of my shop, but it's been one of the best features I put in. I also have a 5 hp dust collector, and have had no issues with any clogging. I did accidentally suck up a rag one time, though, and I don't recall seeing it in the bin afterwards. I did manage to look in the main line of pipe though and it didn't get hung up there. :)

It looks great so far. I hope you have enough outlets for all your needs. I wish LED lighting had been available when I did mine, but my stuff is too new to retrofit so I'm living with it as is.

Kirk


Ah Kirk happy times..., nice plaster work...I too am glad to be done with the plastering :) I hired my lift, it was a bit last minute (£48 for the week). I think the lift and the Genie lifts (ridge beam) have been the most usual things I've ever hired! Top tip on the buy and sell when done. THIS was my plan with a new framing gas nail gun, it still might be...however... As a Furniture Maker I'm pretty fussy about how I look after my tools and cringe when I see the quality of builders and site sparky's abused tools!... MikeG mentioned somewhere about how building work wrecks your tools(?)...I SO now get this! As the nail gun fell off the roof, off the scaffold, off the ladder, down the back of stuff, got rained on, things were dropped on it...it still works...but I'll be lucky to get the return I'd hoped - It looks battered - as for my toolbox chisels, it's the grinder for them ASAP :lol:

Hopefully I've got my ducting placed right - a little stuffed if not. When SWIMBO saw all the sockets she was a bit shocked (pun not intended) at the quantity, I tried to explain as you do :D

If anything there may be too few sockets. The usual working is to figure out how many you need, and double it. I think there's 13? unlucky for some ;) The breaks in the socket runs are (1.) for my P/Thicknesser LHS and (2.) Dust extractor RH back corner.

Thanks for your kind comments,

Jim
 
Erm...

So, floor painted, I screwed in the last bit of skirting today (left over ply) , when an odd quiet feeling occurred to me...

I've finished...[emoji23] how bizarre


f67bb6df77c91d0cf364733422c13cd8.jpg


002d543e1d49eadb66716325f4dbd621.jpg


Sent from my HTC 0P6B900 using Tapatalk
 
You're never finished Jimmy it's just the fun bit that starts now, I've been in my present shop 12 years & im still tinkering with the lay out, I'm rejigging my air line at the minute. Have fun :D
 
Jimmy Mack":1ygt2wu1 said:
If anything there may be too few sockets. The usual working is to figure out how many you need, and double it. I think there's 13? unlucky for some ;) The breaks in the socket runs are (1.) for my P/Thicknesser LHS and (2.) Dust extractor RH back corner.

Thanks for your kind comments,

Jim

Jim:

My shop is a little larger than yours (22' x 26'), and I have 44 120v outlets (in 4 outlet clusters), eleven 240v 1ph outlets, and eight 240v 3ph outlets. The problem is not the number of outlets, it's the placement. I have a couple of spots where all four 120v outlets in a cluster are used. :) I'm thinking of running a 3ph line to the center of the shop in the dust pipe trench and putting in three 3ph outlets for the three central machines. This will get rid of two cords which cross the floor now.

As Doug said, you're not done. Where are your clamp racks? Cabinets along the upper parts of the walls? French cleat along the whole wall of the shop so you can hang stuff anywhere. Now is the time, before you start tripping over your own stuff. :)

Kirk
 
Doug":2muzub3a said:
You're never finished Jimmy it's just the fun bit that starts now, I've been in my present shop 12 years & im still tinkering with the lay out, I'm rejigging my air line at the minute. Have fun :D


Doug, You and Kirk are right...there's plenty to do and there will ALWAYS be a toy on the wish list. It sort of feels like the 'Builder' can now go home and 'Furniture Maker' can AT LAST move in :D

I'm not sure if this is the end of this thread, as a build one that is... or... if it just continues as:

PART DEUX - 'Tinkerings in the Shop' - ad infinitum ;)

Cheers,

Jim
 
Oh yes! I haven't had a look for a while. Looks fab Jim! A proper workshop. Top drawer matey - top drawer!

:text-bravo:

Are you having a grand opening party?

:obscene-drinkingcheers:
 
kirkpoore1":39uvojyy said:
My shop is a little larger than yours (22' x 26'), and I have 44 120v outlets (in 4 outlet clusters), eleven 240v 1ph outlets, and eight 240v 3ph outlets. ...

Kirk

Wow...Plenty of sockets! ... I'm pretty sure I'l be ok, but Kirk you are making me doubt myself with that plentiful configuration 8-)


I've a couple of 3 ph runs to put in still, 3 maybe 4, these will pop up as SWA cable from the floor by or close to the relevant machine, surface mounted on cleats to a rotary isolator... I plan to hardwire the machines ... having put in the cable tray across the centre and 4 hatches dotted about the floor we should hopefully keep things flexible for future adjustments.

Many thanks,

Jim
 
Pinch":pi2z5u5e said:
Oh yes! I haven't had a look for a while. Looks fab Jim! A proper workshop. Top drawer matey - top drawer!

:text-bravo:

Are you having a grand opening party?

:obscene-drinkingcheers:


Thanks Pinch...A celebration party of sorts most definately :obscene-drinkingcheers:
 
Stunning!
:eusa-clap: :eusa-clap: :eusa-clap: :eusa-clap: :eusa-clap:

Please keep this thread running until you have all the machines in place, I'm looking forward to seeing it ready to rock'n'roll.

Terry.
 
Definitely keep it going Jimmy....you can't leave us hanging. We need a "shop tour" with all the machines in place!!

Looks awesome BTW :D
 
Looks great Jim, whetting my appetite for mine moving on.

I would leave this thread alone now as a build thread and start another for the knitting out/setting up phase. That way this one doesn't get lost if people scan past.

Cheers
Mark
 
Jimmy Mack":31dhs5xb said:
Pinch":31dhs5xb said:
Oh yes! I haven't had a look for a while. Looks fab Jim! A proper workshop. Top drawer matey - top drawer!

:text-bravo:

Are you having a grand opening party?

:obscene-drinkingcheers:


Thanks Pinch...A celebration party of sorts most definately :obscene-drinkingcheers:

I think he'd have room to invite most of Yorkshire and still have space for a waitress with canapes!

Great build Jimmy, been awe inspiring watching it eclipse my project in speed and scale and your workmanship is top notch. Looking forward to the new thread and watching the space get filled :)
 
ScotlandtheDave":169k6jwk said:
I think he'd have room to invite most of Yorkshire and still have space for a waitress with canapes!

Great build Jimmy, been awe inspiring watching it eclipse my project in speed and scale and your workmanship is top notch. Looking forward to the new thread and watching the space get filled :)


Cheers Dave...Not so bad yerself...you'll be getting your 'Shed' badge soon.

:obscene-drinkingcheers:
 