Right, where were we? Two days to catch up on, and I'm not going to tell you the whole story until someone answers a question.
First job was to add noggins to the frame over the flitch, and then to add more frames, with noggins this time:
Supplementary question...........why the over-wide and quite short door openings?
I have a ladder fastened permanently in place against the glulam, so left 2 or 3 studs out of the wall to enable easy access:
Having got the roof plate in along both sides, I am now ready to start building the main roof. However, I want to do a couple of smaller jobs first. Firstly, the roof over the utility. You all saw how I lay out rafters during the workshop build, so I won't repeat here. Suffice to say I made the first pair, and offered them up to check:
Looks good to me:
SOOOOOOOO easy if you have parallel plates. Get them wrong and you'll play catch-up all through your roof construction.
So, what's going on here? This is a view of the rafter foot from the inside:
There's your question. Answer that and I'll post a whole load more photos.
.......
I awoke to this sight:
And it was still raining. Over an inch overnight. No chance of any site-work, so I headed to the workshop, where it was lovely and warm, bright and dry. A blue-tit sleeps in my workshop every night (I leave the doors open all day, and it must fly in just before dusk). I let it out as usual, and set to work.
I had rafters to make. Two lots. Firstly, the utility roof:
Secondly, the lean-to roof over the lounge:
Note the rafter foot, very different from the utility rafter. So, what did I spend the rest of the day doing?