So this weekend was a bit of a write off regarding this build. I went out on both days with good intentions of getting the roof slated, figured once I cut all the battens it wouldn't take me more than a day to slate the whole thing, it is only 8 square metres after all...
Well, I planned meticulously using
this site as guidance (very handy, clear concise and easy for the layman), and laid out my battens to the 'correct' gauge (note the ' ' ...) and set to cutting the eaves row, confirming the spacings and fixing them.
Then...I realised that I'd mis-measured when fixing them and they were on a slope, so they had to come off again! Threw a hissy fit and went inside for a brew and to warm up the three fingers on my hammer hand that I had completely lost all feeling in despite wearing gloves (it was between -1 + 1 Deg C all weekend).
Back outside 30 mins later to take them off, breaking a couple in the process and re-fixed them in the correct place. Continued up from the bottom left corner, soaker, slate, slate, soaker, slate, slate, then... Realised that I didn't have the double lap that I'd planned! Not only did I not have the 100mm double lap I'd planned for, I literally had no lap! The bottom of row three only just reached the top of row 1!!!
Another hissy, another brew and warm and tried to work out what went wrong. Re-watched the video a number of times then it clicked, all his calcs are based on slates nailed just over halfway up...mine are top nailed! :eusa-doh:
Re-worked the batten gauge based on my new found information (175mm rather than the original 230 I had used) and called it a day.
This morning I come down, sort kids out for schooling, answer a few job hunting emails and LinkedIn messages and back outside it is. Off they all come again, only one breakage this time (well not all, eaves slate and row one could stay, it was the second slate batten and all after that needed to come off. Battens off and re-fixed in the correct place and start re-fitting slates (after confirming the double lap is there before fixing anything!!).
Most done then inside to warm, brew and sort lunch for kids, then back out and knocked the rest off. Still need to cut the ridge row and fix them but I'm in for a warm, a brew and to write this first.
Might leave the other side until tomorrow as the light's starting to drop and it's -1 with a gentle breeze, so might stay in the warm and do something with the kids instead!
Until tomorrow...