My new workshop has had a long gestation period but finally the build started this week. During the civil engineering phase my role is labourer ...
Having emptied the log store the roof came off.

The the wall came down carefully so the bricks can be reused. The lime in the mortar was doing it’s job well making clean up of the bricks a bit of a chore.

A couple of big bits of oak needed to come out.

Then the concrete floor was cut and broken out ... even with a concrete breaker that was hard work!

And then the digger was brought in

Once the digger had finished it was time for some woodwork to build the shuttering for the raft.

This was the scene at 7.45 this morning ... everything weighted down so it doesn’t float when the concrete goes in. The first thing the concrete pump operator said when he saw it was he’d seen full packs of blocks lifted but he thought we’d be okay ...

The concrete arrived on time

Pumping starts and we all keep checking that it’s not floating ... the shuttering lifted by 1mm which was judged a success.

10am and waiting for it to set

Walls should be up by this time next week.
Having emptied the log store the roof came off.

The the wall came down carefully so the bricks can be reused. The lime in the mortar was doing it’s job well making clean up of the bricks a bit of a chore.

A couple of big bits of oak needed to come out.

Then the concrete floor was cut and broken out ... even with a concrete breaker that was hard work!

And then the digger was brought in

Once the digger had finished it was time for some woodwork to build the shuttering for the raft.

This was the scene at 7.45 this morning ... everything weighted down so it doesn’t float when the concrete goes in. The first thing the concrete pump operator said when he saw it was he’d seen full packs of blocks lifted but he thought we’d be okay ...

The concrete arrived on time

Pumping starts and we all keep checking that it’s not floating ... the shuttering lifted by 1mm which was judged a success.

10am and waiting for it to set

Walls should be up by this time next week.