Afternoon all
So I planned to start the groundworks for my shop this weekend but unfortunately my promised loan of a digger let me down so having been let down one too many times I need to bite the bullet and hire one otherwise I'll never get this bloody thing going!
My question to you good fellows and ladies is, what is the best/smallest digger I can get away with to do the job?
I don't have any access issues in terms of getting it into the garden however the footings will be tight up against the hedge so that needs to be factored into the equation.
I will be using an 18" bucket (I think...) so it needs to be able to lift that, which even the smallest seem to be able to.
I have seen them ranging from tiny ones that will fit through a standard doorway to 1t, 1.5t, 3t sizes up to much bigger.
Looking at them I reckon even the real small one would be man enough for the task but would I be making he job harder by not getting something with a bit more grunt and would I be better going for a 1.5 or 3t jobbie?
I guess another consideration is that I need to break up the existing slab so whatever I get could really do with a breaker attachment so that might limit my options...
This guy is local so thinking of belling him tomorrow to see what he has and suggests and he also has a mini crusher which might be a good thing to have to re use the existing slab as hardcore for the new slab... Www.sbondminidiggers.com.
Thoughts and suggestions welcomed please.
Cheers
Mark
So I planned to start the groundworks for my shop this weekend but unfortunately my promised loan of a digger let me down so having been let down one too many times I need to bite the bullet and hire one otherwise I'll never get this bloody thing going!
My question to you good fellows and ladies is, what is the best/smallest digger I can get away with to do the job?
I don't have any access issues in terms of getting it into the garden however the footings will be tight up against the hedge so that needs to be factored into the equation.
I will be using an 18" bucket (I think...) so it needs to be able to lift that, which even the smallest seem to be able to.
I have seen them ranging from tiny ones that will fit through a standard doorway to 1t, 1.5t, 3t sizes up to much bigger.
Looking at them I reckon even the real small one would be man enough for the task but would I be making he job harder by not getting something with a bit more grunt and would I be better going for a 1.5 or 3t jobbie?
I guess another consideration is that I need to break up the existing slab so whatever I get could really do with a breaker attachment so that might limit my options...
This guy is local so thinking of belling him tomorrow to see what he has and suggests and he also has a mini crusher which might be a good thing to have to re use the existing slab as hardcore for the new slab... Www.sbondminidiggers.com.
Thoughts and suggestions welcomed please.
Cheers
Mark