HOJ
Sapling
Wood for this is due in tomorrow, Oak stringers and 100mm Oak box newels that I make using a mitre lock corner joint, MDF treads and Plywood risers as it will have carpet over, setting out rod is already done, so will be prepping 41mm KD sawn Oak boards for edge jointing to make up the width of stringers, this drawing was just to work out yield for material order, I will finesse and flair the look once the boards are jointed up and I lay them out.

Only issue is this doesn't comply with building regs @ 45.9 degree pitch, but it is replacing an existing one. (glass balustrade not shown)

Only issue is this doesn't comply with building regs @ 45.9 degree pitch, but it is replacing an existing one. (glass balustrade not shown)
























