Ian I always work at a steady hard pace trying to juggle my commitments till the snow comes. This year is particularly worse as I have lost 4 weeks to surgery recovery. The pressure is on, so a 7 day work week is a must. Although this Sunday I said f-it and had a relaxing day, the only thing I needed to do was reinforce a trail cam on our property that a bear bent over.You certainly don’t hang about duke! I shall follow this one eagerly, that would be a good size for a workshop, but I suppose you would have prepared the ground differently for that?
Ian
It really is a different world duke (Bears) I think you Americans and Canadians work much harder than we do over here. The realities of life seem to be more stark. I’m out of touch but I think our paid vacation is 4? weeks plus Heaven only knows how many Bank holiday days 6? You probably only get two weeks in total and probably not that if self employed.Ian I always work at a steady hard pace trying to juggle my commitments till the snow comes. This year is particularly worse as I have lost 4 weeks to surgery recovery. The pressure is on, so a 7 day work week is a must. Although this Sunday I said f-it and had a relaxing day, the only thing I needed to do was reinforce a trail cam on our property that a bear bent over.
So do I Mike, the first day the owner and I mixed concrete for six footing and you just back up to the hole and dump.I love the mixer powered by the PTO!
Ian every barn build I have been involved with is different. This is what we and our neighbours to the south, like you will be, call and a Pole Barn.I’m getting the definite impression that this isn’t the first thing like this you’ve built duke!
Soon! And hell yes would I love a barn, some of the stone barns around here are just so beautiful! Usually built on a slope so as to get into the first floor often up a shallow ramp.Ian every barn build I have been involved with is different. This is what we and our neighbours to the south, like you will be, call and a Pole Barn.
Luckily the roof pitch is only a 5/12.
Are you saying that front beam is 10x12? If that’s correct that will take a great deal of weight. How are they fastened together, coach bolts?Front beam is a 5 ply 2x12, rear beam will be a 4 ply 2x10.