I hadn't expected to be building the inner skin of the outer walls myself. I asked a number of brickies for a quote, only one turned up, and he wanted an absolute fortune........so here I am again, doing it myself. As the profiles had worked so well in building the chimney, I spent a while setting up corner posts all properly marked out with levels, so that I was just running in to string lines without having to build up any corners:
Note the plastic DPM pinned up out of the way, and the course of bricks which I always include at the bottom of blockwork to enable any adjustment to levels to happen easily. The first 3 courses of blocks are lightweight aerated insulating blocks (Celcon's):
This shows the top of the second course of blocks, with the DPC bedded in place, the insulation fully filling the 100mm cavity, and the ties bent up out of the way. They were straightened out immediately after the photo to be set in this mortar course:
That's 2 walls done to top of plinth, where the detail changes (different blocks, different ties, and different insulation):
At the junction with the house there is about an 8 or 9 inch gap to allow me to demolish & rebuild the plinth of the old cottage, and to dig out a foundation. I thought I would "tooth" the blockwork, to make it easier to join up later when the old part is finished. This half-block is on a couple of dabs of mortar and has an empty perp, so that removing it later will be easy. I'll repeat this detail at alternate course all the way up:
I made a start on another wall:
Nice light evenings mean that finishing at 7.45pm isn't a chore.