Today was the big day......raising the roof.
The first job was to fix some 100 x 50's to the top of the ridge beam, to space it the right distance down from the rafters. The alternative of having a 10" x 6" solid oak beam was just too heavy to even contemplate, and besides, this arrangement gave me a nice easy place to run some cables to a couple of light positions, which became my 2nd job of the day.
I had decided a few days ago that trying to raise the ridge beam (don't forget, it weighs over a third of a ton) on a tower scaffold was going to be too cumbersome and unstable, and that building a purpose made structure would be safer and ultimately quicker. I designed a framework of 4x2's:
The trick, as I have shown with previous lifts on this job, is to have the pair of fulcrums close enough to the centrepoint such that there is a large counterbalancing effect, and one simply see-saws the beam up into place. So, whilst I lifted on end, my buddy would insert a packer across the framework, and clamp it in position:
Every 650mm, we would unbolt the redundant lower horizontal member of the framework, and bolt it in just above the beam, and then use that with cross bearers, allowing the removal of all the packing from below. A couple of times we needed to move the beam horizontally, and we did this very simply with rollers:
The temporary tie beam had been in the way, so we moved it a couple of times, until we could get one in below the beam we were raising. The nearer you get to the top, the less you can raise it each time, because you bump the raised end of the beam onto the rafters:
Nearly there! We did the last inch or so with acrows, which I didn't phgotograph. All in all, it took about 3 hours to raise the ridgebeam:
If you look carefully you can see some temporary supports of 4x1 screwed to across the face of some rafters to hold the ridge beam in place. The first of the King posts went in easily, despite us fighting gravity:
We had to put the rafters in place and held in a temporary manner before raising the tie beam. The first pair were fouled by rafters behind, so we couldn't lift them as far out of the way as we would have liked:
We're not going to do this again. It was too unstable. Nonetheless, it worked:
Once the see-sawing method had raised the tie beam as high as the underside of the bottom mortice, we were unable to rock it any more. I set up a fulcrum, and used a long piece of 6x2 as a lever to do the last 3" of work, then a bit of bashing here and there, and at last I was able to get some pegs in:
There was then a certain amount of messing about to do to release the temporary supports for the rafters and lower them into there appropriate mortices, but all the joints worked fine (albeit I had forgotten to drill on of the peg holes, and so had to do it in situ. There will obviously be no element of draw-bore about that joint.
After securing the ends of the first tie beam, we moved on to the central position, set up a new working platform, and raised the King post and braces into place. This was slightly more awkward, as there were 3 joints to line up and hammer home, rather than two as per the first truss. One of the joints wouldn't co-operate, and I managed to break a peg off in the hole. Luckily, there was a second hole which pegged up easily:
We also located the rafters, and were able to get them well out of the way this time:
That was close of play for the day:
We should have the roof fully erected by lunchtime tomorrow.