Frustratingly, I've only been able to do the odd hour or two here and there in the last few days, but I got a good run at it today, putting in the best part of 12 hours work.
Details, details.........
It's always the details which take the time. You can make a good dramatic show by getting a few rafters up in an hour or two, but it takes longer to do the eaves details than it did to do the rafters. There are lots of different ways of closing the eaves, and because I want exposed rafter feet I had to come up with something between the rafters. I wanted something square to the top of the boarding, so that I have a good place to finish the boards to under the eaves, rather than just sort of stop somewhere near the felt. This is what I came up with:
Here's a barrow full of bits:
And here they are all screwed together. I kept the screws well in from the ends, and made the pieces over-long, so that they could be trimmed to suit the measured gap between each pair of rafters.
It took ages to trim them all individually to length, hammer them into place, then skew-nail them. Finally, I ran the power plane over the top of them to bring the tops in line with the tops of the rafters:
Before:
After:
Then I quickly did the studwork at the gables, and then took ages fitting 50 x 50's between:
This is the end of the big roof where it meets the smaller roof. This was a pain. Not only does the big tie beam curve in 2 directions, but the width of a stud is more than the width of the rafter plus the width of the tie beam, so the studs didn't actually line up with one of the faces of the beam, overhanging by a nasty 6 or 8mm. Still, I cracked on........
The small gable:
That was the end of the weeks work, and I was away Saturday.
-
Sunday: because of a really early start and not wanting to disturb the tranquility at 7.30, I began with a good tidy up and re-arranging of piles of timber, shifting the OSB near to the workshop. I made a pile of the insulation which will be in use in the next few days, as well as the roof felt etc:
By the time I came to use power tools the place was looking ship-shape. First job was to cut a whole lot of threaded rod "bolts". Actual bolts are expensive, so I buy threaded rod and cut it to length, with 2 nuts. However, there is a catch: if you cut the rod and then try to thread a nut onto it, you'll never succeed. The best answer is to cut it with 2 nuts already on the "bolt", and then you take one off. In unwinding it, the nut cuts through the burrs and mess at the site of the cut, leaving a reasonable thread and giving you a good chance of getting a nut back on without too much of a fight.
The joy of 600 centres on rafters is that you can fit a drill and spade bit between them, and can thus easily drill out for bolts:
Having bolted up all the raised ties (joists), I turned my attention to boarding the gables:
Note the 50 x 50 planted onto the gable, to take the edge of the OSB sheets on the underside of the rafters. Note, too, the batten finishing the nasty little overhang of the studs on the tie beam:
Middle of the afternoon, and the gables are all boarded:

There's a lot more work in those than you'd think, and some of the big sheets were damned awkward to lift into place. It was particularly annoying to have to take some of them up and down 2 or 3 times before I got them right.
Mabel thinks I need a green thing for the next phase of work:
After lots of measuring and thinking, I decided on a strategy for boarding the underside of the rafters. I started with a line just above the joists:
Then, with the help of a temporary batten to support the lower edge, I did the skillings (sloped ceiling below the joists). This involved cutting around the joists, which usually meant 2 or 3 goes at it. No wonder I am so tired now!!
Nearly done:
Finished! Too dark to take a photo outside:
So, lots of fiddly stuff in the last few days, and progress isn't as dramatic as before, but I'm getting very close to felt and battens, and thus being nearly watertight.